Answer / mallikarjuna
M10,M15(P.C.C)
M20,M25,M30,M35,M40(using OPC)
M50,M60,M75(using micro silica)
| Is This Answer Correct ? | 399 Yes | 65 No |
Answer / kiran babu t
M5, M10,used for P.C.C and now a days M15 grade of concrete
has been widely used for PCC.
Where as M20,M25 used for footings,columns,beams&slabs.
From M30 grade of concrete onwards it is Design Mix
M30,M35,M40,M45,M50,M55,M60,M65,M70,M75,M80.
| Is This Answer Correct ? | 306 Yes | 47 No |
Answer / sandeep kumar
For Lean Concrete = M-5,M-7.5,M-10,M-15
For RCC Concrete = M-20,M-25,M-30,M-35
For Coloumn, Pier etc = M-40,M-45,M-50,M-55
For High Grade of Concrete = M-60,M-70,M-75,M-80,M-90,M-100
| Is This Answer Correct ? | 199 Yes | 47 No |
Answer / hanishsehgal
M20, M 25, M30 , M35 , M40 , THESE GRADES ARE USED IN
ORDINARY BUILDINGS AND THEY ARE DEPEND ON THE LOAD OF THE
BUILDINGS
M45 , M50 .
FOR R.C.C - M20 , M25 , M30 , M35
FOR COLOUMN - M40 , M45 , M50
| Is This Answer Correct ? | 145 Yes | 29 No |
Answer / harsha
Ordinary Concrete M10, M15, M20
Standard Concrete M25, M30, M35, M40, M45, M50
High Strength Concrete M55, M60, M65, M70, M75, M80
| Is This Answer Correct ? | 116 Yes | 15 No |
Answer / rajeshwar mishra
M15,M20,M25,M30,M35,M40 ACCORDING TO THE PLANNED STRUCTURE
| Is This Answer Correct ? | 72 Yes | 13 No |
Answer / sunil khairnar
Depends on Mix Proportions. (i.e. 1:2:4, 1:1.5:3 etc.)
| Is This Answer Correct ? | 78 Yes | 23 No |
Answer / v.ramachandraiah
The meaning of the Grade of concrete is charactorstic
compressive srenth of the 150mmx150mmx150mm concre cube at
28 days age
| Is This Answer Correct ? | 30 Yes | 1 No |
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
what does the track parameter mean in staad.pro?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What are the different types of pile founations used?
Define What is passive earth pressure ?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
how do i find the fixed end moments in the fixed beams with the use of general method?
what is the creep in concrete
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
Stander Size of Brick
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)