Answer Posted / satish k. shukla
M15 , M20 , M25 ,M30 ,M35, M40
| Is This Answer Correct ? | 91 Yes | 18 No |
Post New Answer View All Answers
how to take concrete quantity for precast segment for viaduct project?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
I am called for interview from north east power plant .so, I need some interview question which may help me.
What is the difference between engineering stress and true stress?
how to find out hard strata in bored pile when the DMC method adopted.
What is the basic difference between OPC
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
What is the outturn of Ceiling plastering
construction workers how much time take one work or qty
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
Why concrete barriers have curved surface profiles?
What do you mean by honeycomb in concrete?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
how u design STAGING for Superstructure in BRIDGE construction?
What is the diff between cad & cadd?