Answer Posted / kiran babu t
M5, M10,used for P.C.C and now a days M15 grade of concrete
has been widely used for PCC.
Where as M20,M25 used for footings,columns,beams&slabs.
From M30 grade of concrete onwards it is Design Mix
M30,M35,M40,M45,M50,M55,M60,M65,M70,M75,M80.
| Is This Answer Correct ? | 306 Yes | 47 No |
Post New Answer View All Answers
What is geopolymer based concrete?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
If specific gravity of cement is less than 3.15 what is the cause?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
What are the applications of the modulus of elasticity?
What type of tensile strength is handling by crank in beam? Thanks.
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
how can we construct building without foundation providing only grade beam at ground level
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
How many litres of water used for curing of 1000sqft of slav
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
What quantity of 1.0 m3 bricks required?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,