Answer Posted / sandeep kumar
For Lean Concrete = M-5,M-7.5,M-10,M-15
For RCC Concrete = M-20,M-25,M-30,M-35
For Coloumn, Pier etc = M-40,M-45,M-50,M-55
For High Grade of Concrete = M-60,M-70,M-75,M-80,M-90,M-100
| Is This Answer Correct ? | 199 Yes | 47 No |
Post New Answer View All Answers
how to find hardness of water?why it should be determined?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
what do you know that m20,m25
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
what is the specific gravity of rubble in plum concert
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
Moisture content calculation for diff mix ratio's ??
Explain how you can turn off the display for dimension in CAD?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
For a washout valve why are two gate valves required in normal practice?
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
what is diffrence between catchment area,watershed and basin?
may i know the detailed description of cutting length