what is credit horizon date & whats its purpose.
Answers were Sorted based on User's Feedback
Answer / nandakishore k
Dynamic Credit Limit Check with Credit Horizon
The customer's credit exposure is split into a static part;
open items, open billing, and delivery values (see above),
and a dynamic part, the open order value. The open order
value includes all undelivered or only partially delivered
orders. The value is calculated on the shipping date and
stored in an information structure according to a time
period that you specify (days, weeks, or months). When you
define the credit check, you can then specify a particular
horizon date in the future (for example: 10 days or 2
months,depending on the periods you specify). For the
purposes of evaluating credit, you want the system to
ignore all open orders that are due for delivery after the
horizon date. The sum of the static and dynamic parts of
the check may not exceed the credit limit.
Is This Answer Correct ? | 13 Yes | 1 No |
Answer / inturi madhavarao
Horizon date is used for Dynamic credit check. if you
specify horizon date, the system consider al the values
which falls under this date. the system will not take into
account if the values fall after the horizon date.
EX: if you specify horizon date 2 months. Then system
consider the open values which falls with in two months. if
the value fall after the two months, the system ill not
take into account.
Is This Answer Correct ? | 16 Yes | 8 No |
Answer / venkat
Date of credit horizon
If this indicator is set, only the outstanding sales
values which fall
within the defined credit horizon are taken into
account when
calculating the credit limit used.
The date defaulted in this field is the smallest
horizon specified for
the customer and the risk category in Customizing for
credit control.
a horizon has not been specified in Customizing, the
system defaults t
current date, and all outstanding sales values are
taken into account
for the credit limit used.
Procedure
Enter the required date. The system calculates the
proportion of the
total commitments that have reached the credit limit by
the specified
date.
Is This Answer Correct ? | 9 Yes | 2 No |
Answer / ratna kumar
System will consider all the open sale orders value (for
updating in FD32 & for credit check) for which required
delivery date was given within this horizon period.
Ratna
Is This Answer Correct ? | 5 Yes | 1 No |
boss,
you know cr. mgmt are 2 types. in Automatic point of view
HORIZON PERIOD is there. bcz it shows that on which date
this CREDIT MGMT. will start or applicable, if at the time
of configuration if it is blank ,then system will take
today date that means on configuration date b default.
Is This Answer Correct ? | 6 Yes | 6 No |
In pricing first 100 sales orders there is no discount.From 101 to 200 sales orders 5% discount and next from 201 to 300 orders 10% discount.So how we maintain?
Explain the basic configuration of free goods.
How to create tasks. What are the maximum number of tasks you were created in you are previous project?
Please explain the purpose and configuration of Partner Determination. I was asked this question in an interview. I get confused in partner function, partner type, account assignment, partner procedure etc etc. I would be grateful to you people if you can clear my basic concepts on this topic. Thanks in advance
what is differnce between inclusive and exclusive?
Can any body please send sap sd foreign trade user manuals.. chavamba@gmail.com
What problem management and incident management?
What is the use of a partner function in sap sales and distribution?
what is bonus buy?
Status Profile I have a doubt in Status Profile. I have set the status profile and I can see the same in order, however please confirm if the authorized person now needs to approve it, how he will do that. I am testing it in IDES, not sure about the last step For example if it is VA01- Will he go to VA01 to approve it or reject it. Please suggest as I am not sure about the last step.
What is the difference between Rush Order & cash sale orders?Please reply asap... Eagerly awaiting for your response? Thanks in advance.
If question will arrise that are you any project,because I am a fresher in sd but I have shown 1 yr of experience. So can I say I'm in implementation or support project?