Answer / shiba
You can assign a credit limit to a group of customers, as
well as to an individual customer. If a company has
different branches, you would define the credit limit for
just one customer in this group (the head office) and this
customer account then becomes the credit account.
Credit limits are normally specified by credit management
staff in the individual customer master records. You can
specify individual credit limits for each credit control
area. You can expand your credit control for a customer by
specifying a central credit limit for all credit control
areas to which that customer is assigned. The total of the
limits at the level of the credit control area must not
exceed the total limit for all credit control areas. The
credit limits at the control area level are checked during
sales order processing.
Is This Answer Correct ? | 15 Yes | 2 No |
Answer / aju joseph
cr.control area+risk category+credit group = automatic
credit control. In the overview screen one can define
credit contol and configure different block based on ststic
or dynamic credit control
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / bobby
credit control is determined in the combination
COMPANY CODE + CUSTOMER RISK CATEGORY + CREDIT GROUP =
CREDIT CONTROL AREA
Important criteria that should be kept in mind is that one
company code can be assigned to many credit control areas
And multiple company codes are not assigned to one credit
control area
Is This Answer Correct ? | 14 Yes | 11 No |
Answer / satya
Credit control determination dependencies are credit limit,credit group from sales document type,activate check box for credit check in item categories and putting "A" for sub total in pricing procedure for total value then only price will determine for the customer.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / man singh negi
If we give credit to customer and already set the term and
condition with customer as per purchase order.
After that customer is not pay or linger on payment then we
can charge interest on late payment. May be Rs. 100/- per
day or more.
Is This Answer Correct ? | 0 Yes | 1 No |
What is Roll-Out project in SAP ? And where it will start and What knowledge SD consultant shouled needed ?
Hi All, I am taking the SAP SD course and need some live case studies for my practice, can any one help me in this regard. You can mail it on my mail id: simkim4u@gmail.com Thanks, Sameer
What is higher level item category?
What do you mean by physical inventory management?
What is work flow ? and what is Price type ? Please reply as soon as possible. Thanks
IN sales order for a line item for that material i want the updated price for that particular line item instead of every time going to vk11 and changing the price for that material i want the updated price for eg if the material cost is 100 rs and updated price is 110 rs i want the updated price to be trigger for that material when we give that in va01 with out maintaing in vk11
what is sap posting period? What is the transaction code to open and close posting period?
where is plant determined?
What is the function of RA00 and RA01 condition types and how does they work in sales order, Please answer.
Document 90036320 saved (error in account determination) Message no. VF051 in this error
Who will do MIRO and ME21N in sap sd third party process ? Is the Enduser or MM guy or SD .
i have done changes in an order (delivery date etc) and save . but when i go to change option in environment tab ,i found no chnages has been made. kindly revert its urgent