what is stressing
Answer / gurunath khavanekar
Stressing is the word generelly use in post-tentioning
slab.(PT slab)
stressing means stress the strands(cables) by using the
hydrulic machine. when the concrete get required strength.
| Is This Answer Correct ? | 19 Yes | 0 No |
how to find no bar in 1 length
what is lifespan of an RCC structure? Why the RCC structures failing in quater of its life span?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
0 Answers Ministry of Agriculture,
As an engineer, what u should do when the construction of a building doesn't meet the required specifications?
colum 500*500 8mm cutting lenght
how to find hardness of water?why it should be determined?
A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?
what is the quantity of cement,sand and aggregate in 600*600*1600 mm in 1:4:8
What is the snap size in civil and how can we create it?
what is right time of slab DE shattering and beam boo tam.
What is aggregate?
if the diameter of capillary tube is double then the capillary rise will be
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)