How to calculate the Volume of PCC, Footing Base, Footing Column, Grouting, Base Plat and plinth beam
what is mix design
why breadth of beam is shorter than (or equal to )its depth?
water cement ratio
for basic costing, how can we calculate how much amount of steel and cocrete will go in per sqft? and what are the thumbrules?
Sand density
wht is off shore structure
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Why curing is necessary for concrete
what are IS code for M20, 25, etc
40 Answers Aarvi Encon, Best Builders, L&T, NCC, PWD, RNS, Vardhman,
how to calculate number of bitumen for road asphalt
how to calculate the number of cement bags for basic construction..?
3 Answers Gammon, Indu Projects,
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton