How would you attach a drawing to the equipment master data?
No Answer is Posted For this Question
Be the First to Post Answer
What is purpose of offset entry in single cycle maintenance plan?
Is it possible to assign a user status to the operation and sub operation of a maintenance order?
We have cost center in main work center as well as in equipment master? What is the purpose of maintaining cost center at both places?
explain business completion?
Differentiate between equipment master and material master. On what basis do we decide which one should we create?
Suppose there is a difference between the planned and actual hours of internal manpower where will you document the reason/ cause of this variance. Is there any standard sap facility available to address such situation.
Differentiate between work center and main work center.
Is it possible to assign user status to a sub-operation in maintenance order?
Hi, How to reverse the refurbishment order process incase the user 1)dont want to get the goods back and 2)without incurring the cost?
What are class and characteristics? What are their use?
How can we assign measuring points to a strategy plan like compressor running hrs
What is order type for preventive maintenance?