Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Answer / Neeraj Kumar
First, calculate the total weight of bricks and mortar for a given volume (1000 cubic feet). Then, find the labor cost to lay the bricks and mix the mortar. Add these costs together to get the total cost. Divide the total cost by 1000 to find the rate per cubic foot.
| Is This Answer Correct ? | 0 Yes | 0 No |
1sqm tile laying how much cement required?
What is the difference between yeild strength and compressive strength of steel???
How to calculate density(dry & bulk) of sand from Sp. ravity value of sand. eg. G=2.5
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
How to rectify thermal cracks (2mm wide, 9mm deep aprx. ) developed in tremix finished concrete floor?
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
In what construction is concrete grade m35 used?
4 Answers Cipla, High Concrete,
compressive strength of country bricks in india
The designs required to construct a building are ––
why demand factor less then 1 ?
what is stress
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)