Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
No Answer is Posted For this Question
Be the First to Post Answer
how can calculate qty of steel required for one or two ways slabs..
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
What is the difference between M20 and M25 concrete?
3 Answers CSC, Focus Energy, ME,
waht are pressure bulbs
what is difference of NP3 and NP4 pipe and what is the thickness of 1000mm dia NP4 pipe
how we control the temperature during concreting ?
whta are the types of columns
1.0 what is the permissible westage of steel in structural steel fabrication say gantry , trustle of power plant unit 2.0 what is the permissible westage of cement in construction work as above
if we make b.b.s then bend correction is taken how much..
What is IS ?
How can we cross check the excavation and backfilling quantities.
Formula of area of crane hook
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)