Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
No Answer is Posted For this Question
Be the First to Post Answer
What is the difference in design between Working Stress method & Limit State Method ? Briefly Explain.
What is Time at Large?
"Gates of the dams are generally designed of curved shape". Why?
How much time Required for PPR pipe network testing
Can we use PPC AND PSC CEMENT FOR MIX DEIGN?
1 Answers IVRCL, Reward Constructions,
brick size-230x110x75, how many no of bricks cover 1cubic meter.
What is Refuse Area ? And What is Definition ?
What is bylayer?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
Is there any alternate for plastering
what is anchorage length,lap length and (dont remember the last one)
which grade of concrete is the strongest? M20,M25,M30,M35 or M40?