is it fair to recruit another prestressing agency once
earlier agency has provided guide cone for post stressing
the Concrete -I girders? It is observed that the bearing
plate of another agency is not matching with the earlier one
resulting in protruded strands after stressing from the face
of girder. Kindly advice.
No Answer is Posted For this Question
Be the First to Post Answer
What are some facts about concrete?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
How to find out kg per Sft ?
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
what is the shuttering normal clear cover for footings, walls, beams & columnms
why don't we need shear reinforcement in slabs?
what is 20 mm dia equivalent reinforcement in column with 25 mm dia 3nos and 32 mm dia 3 nos?
how calculate the ms angle weight formula detail
9 Answers Concor, Puravankara,
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
Cement coefficient used for Solid and hollow concrete blocks
how to calculate cost for MS plate shuttering (show calculation/assumptions)
How do we test on design and style in a software?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)