is it fair to recruit another prestressing agency once
earlier agency has provided guide cone for post stressing
the Concrete -I girders? It is observed that the bearing
plate of another agency is not matching with the earlier one
resulting in protruded strands after stressing from the face
of girder. Kindly advice.
No Answer is Posted For this Question
Be the First to Post Answer
how much least count of levelling ?
How Much span required for 1 sqm of shuttering(Beam & Slab)
Why do we provide development length in RCC?
what does the grad of cement shows (denotes)?
Wat are the elements consider in the shuttering load design calculation
In pile foundation which kind of action are take place?
what is the permissible safe bearing capacity of soil?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
what is tensile strength of {6,8,10,12,16,20}mm dia bar? also there were any formula?
what is the logical concrete mix design for M 30 Grade and the cement consumption per M3
how i can tak Quantity of mortar in block work
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)