is it fair to recruit another prestressing agency once
earlier agency has provided guide cone for post stressing
the Concrete -I girders? It is observed that the bearing
plate of another agency is not matching with the earlier one
resulting in protruded strands after stressing from the face
of girder. Kindly advice.
No Answer is Posted For this Question
Be the First to Post Answer
what is conrete grade ,how are depent on concrete grad and size of concrete?
20. Do you adapt easily to new environment, job?
How to fix steel in rectangular footins? I.e first along the length or first along the width??
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
how to calculate concrete quantity for footing using M25 grade 1:1:2 for 730cft.
Define What is aggregate?
Dear sir, What is the procedure for total station?How to calculate?
state and explain in Water absorption of brick
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
what is the load bearing capacity of the scafolding pipe (50mm) and other.
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
0 Answers HR Construction, JP Group,
Cost control in civil construction as well as Quality control
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)