how to estimate the earthwork,earth-filling for an isolated
foundation

Answers were Sorted based on User's Feedback



how to estimate the earthwork,earth-filling for an isolated foundation..

Answer / d. baby

size of footing x depth of footing = earthwork qty
a x b x d = qty
total earthwork - isolated footing qty = earth filling

Is This Answer Correct ?    15 Yes 3 No

how to estimate the earthwork,earth-filling for an isolated foundation..

Answer / kumud ranjan jha

Excavation > is l x b x h
but filling is total excavation - pcc-rcc of footing up to NGL

Is This Answer Correct ?    7 Yes 1 No

how to estimate the earthwork,earth-filling for an isolated foundation..

Answer / ramcharan

Earth quantity = aria isolated footing + working margin
Earth filling quantity = earth quantity _ isolated footing

Is This Answer Correct ?    4 Yes 1 No

how to estimate the earthwork,earth-filling for an isolated foundation..

Answer / pradeep

isolated footing quantity is not is a x b x d.

Is This Answer Correct ?    2 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

What are some facts about concrete?

0 Answers  


do we decide reinforcement steel , based on bending moment ? give example with continous slab?

0 Answers  


Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com

0 Answers  


Is there any relation between grade of concrete and Steel

2 Answers  


how many kg of 20mm, 10mm, dust available in one ton stone boulder

0 Answers   Nandi,






What is OSHA compliance?

0 Answers  


how to calculate the required qantities of cement, Sand and aggrigate to prepare 1 Cum of concrete mix 1:2:4

5 Answers  


what is 43 and 53 grade of cement? that 43 & 53 represents what?

8 Answers   L&T, Saint Gobain,


What is Definition Of Refuse Area In Building ? 

1 Answers   Arpee Group, Dudhwala Builders,


GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?

0 Answers  


Is there a way to know the aprox shuttering qty if vol of concrete is known? any thumb rule?

2 Answers  


As shown in IS 456-2000 minimum cement content is include fly ash?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)