what is the measure of slump
Answers were Sorted based on User's Feedback
A slump test is a method used to determine the consistency
of concrete. The consistency, or stiffness, indicates how
much water has been used in the mix. The stiffness of the
concrete mix should be matched to the requirements for the
finished product.
All concrete is a combination of aggregate (gravel and/or
sand), cement, and water, but the proportions of the mix
can be varied. A larger proportion of water causes a
softer, wet concrete mix, which is easier to handle during
the pour and requires less care during curing. It also
results in a slightly softer and less durable finished
product. A smaller amount of water causes a stiffer, wet
concrete mix, which is harder to manage but makes a
stronger and more durable finished product, one with a
higher concrete pounds per square inch (PSI).
| Is This Answer Correct ? | 11 Yes | 1 No |
Answer / s.silambarasan
Slump is measure in mm and it is for checking the
workability of concrete.
| Is This Answer Correct ? | 8 Yes | 0 No |
Answer / sobhanbabu
slump is nothing but a sudden fall of concrete.it depends
on water cement ratio.uaually it is measure in mm
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / er. vaseem ahamad
Slump test is required to know work ability of concrete.For different purposes of concrete slump should be also different.According to reinforcement design and depth or height of structure slump should be different.
Slump test apparatus is cylindrical mould which height is 300 mm,upper dia is 100 mm and base dia is 200 mm.After fixing by nut bolt above bade plate we fill concrete in four layers and compacting by 16 mm dia and 600 mm long teppered steel rod by 25 stroke in each layer.
By this test we can maintain water cement ratio of concrete.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / bishwa mohan thakur
slump test measure the consistency of concrete.It measure the flow of concrete and the work-ability of concrete.We also know the water cement ratio in concrete.It is measure in millimeter(mm).It is measure in the slump cone after the concrete lay in the cone in three layer and each layer we temper 25 times.If we require concrete in pipe line slum value should be 100-120mm and if we directly pour the concrete the slump value should be 80-100mm
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ramprakash mohan
18-20mm is allowable as per codal provision
| Is This Answer Correct ? | 0 Yes | 4 No |
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
what is the ratio of m50 grade in concrete block
what are IS code for M20, 25, etc
40 Answers Aarvi Encon, Best Builders, L&T, NCC, PWD, RNS, Vardhman,
what is the meaning of degreasing of the euipment or line.
Minimum no of bare in beam
As per IS 2502 2(A+B)+24d formula is given for stirrups detailing,but explination not given for how that 24d came
point of contraflaxure
How to repair the Pavement quality conc used for toll plazas if is giving hungry look or honeycombed ? how much cement need to treat 100sqmtr of Damaged PQC
What is the worlds largest concrete dam?
in 100 cft = 1350 bricks in 100 cft = ? bloks
What are the responsibilities of a construction manager?
1. What is difference between auto level & dumpy level?
2 Answers Qatar Airlines, Sita Homes,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)