how to calculate 1:5:8 ratio concrete cement, sand, metal
and water please give me brief calculation
No Answer is Posted For this Question
Be the First to Post Answer
How many are the types of joints?
In barbending schedule why is o.42*D is taken. Means why o.42 only???
why construction joint in the slab should be l/3 of span? what's the technical reason for that?
What is the ratio of cement ,sand, and aggregate to be used in M20 grade of concrete when excavating 200 x 200 x 200 mm of sand from soil
how much steel required for 1 square meter slab?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
what cement consumction plaster 15mm think per sqmt 1:3&1:6 how much kg.
what is slope provided to floor?
what is the meaning of 40/20 src
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
What is the bar bending schedule
Pls. help. If a contract was awarded to a contractor in april 2012 with steel & cement base price as rs. 45/kg & 250/bag. Now in oct. 12 steel cement price becomes 55/kg & 290/ bag. How escalation will be calculated? Pls. tell complete calculation Regards,