Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate sump capacity

Answers were Sorted based on User's Feedback



how to calculate sump capacity..

Answer / madhesh

calculate the sump capacity in m3(cum) and multiply with 1000 liters this is the value in liter

Is This Answer Correct ?    8 Yes 3 No

how to calculate sump capacity..

Answer / senthil

The capacity of sump will be Length x Breadth x Depth (all in meters) = Cum. Further multiplied with 1000 to convert cum to liters.
I think you must be asking for capacity of sump required. If so then it is determined by detention time (days) x no. of users (nos.) x 135lpcd (CPHEEO standard for Urban use).

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what is the grade of 1:2:1 concrete mix

1 Answers  


how many brick in 1 cubic meter with mortar ?

9 Answers   Electrical, SV,


What mean by Characteristic strength of concrete (fck)

1 Answers   IJMCPL,


What is Well Point System in Dewatering

3 Answers  


What is the development length given in pile?

0 Answers  


Is it possible 18" beam rest on 18" beam and created the junction on beam instead of column?

1 Answers   Nespak,


what is mcArther pile?

1 Answers   Kerala Public Service Commission,


how to caluclate sienerge qty in construction in ap

0 Answers   NTPC,


during site visit if i find voilation going on,what can i do,how i act?

3 Answers  


Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

0 Answers  


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

0 Answers  


What is the difference between Wraft and file foundation and where these are used ?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)