Planning Engineer interview model question and answer
Answer / kumar
should know operation plan, should know outage program,PM & CM schedule,Budget control, Data gathering, create database, documentation, cmms,primavera, ms-office& excel in expertis, 3cs
| Is This Answer Correct ? | 0 Yes | 0 No |
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
what is the defenation of efficiency in the high pressor boiler? what is the formila of efficiency in the high pressor boiler?
what is water consumption rate of water to condense one ton steam in condensor.
why do we use contro fluid tank (cft)in turbo generator area(tg) in power plant?
what is actual CAL MODE & cal means?
why IBD Vent is kept at higher elevation than CBD ?
what are the steps of syncronizing the generator with an infinite grid?
.What are the equipments should run when there is a black out in power plant.
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
Why cold water is used for Boiler Hydro test
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
procedure of how to generate power in solar plant.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)