Planning Engineer interview model question and answer
Answer Posted / kumar
should know operation plan, should know outage program,PM & CM schedule,Budget control, Data gathering, create database, documentation, cmms,primavera, ms-office& excel in expertis, 3cs
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is difference between secondary Air & Tertiary Air and Their use.?
what's the moog valve
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
what is the basic use of power plant in equipment
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
can dp type level transmitter work in under vaccum condition
what is natural frequency of turbine shaft .
procedure of how to generate power in solar plant.
what is the difference between compensated & normal drum level in boiler drum?
How We Calibrate the vaccum transmitter?
what is restricted earth fault explain in details
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
What is LB-SR.
what is the meaning of SST300 V56A in SIEMENS turbine