after applying C-License in how many days we get it?
Answers were Sorted based on User's Feedback
Answer / dave mudra
'C' License is "Electrical Contractor license" which we get from Tamilnadu.
| Is This Answer Correct ? | 0 Yes | 0 No |
what is earthing.how we make it,describe briefly.
how you configure motorvision relay (L&T make)from DCS
What is working principle of washing machine?
Discuss the effect of sudden loading of an induction motor
how to calculate the cable size depending on the transformer rating
What is chopper
how many stairs have you climbed while you were coming
What is the permissable nutral current of three phase system as per IS standards?
can we done C.T.sc at output? if yes y,if no y?
How to select batteries required for ups and the inverter if we Known load? And how AH is selected of battery?
A power transformer 4MVA/11KV/0.415Kv has been out of use in 12years. what maintenance actions/test need to be carried out before energizing.
how we start 40w tube light with 4 diodes,2capacitors,1 choke and without starter.(a product avilable in market which lights burnt tube lights also)
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)