Labor requirement for each item needed?
Lean Concrete 103.550m3
Concrete for Foundation and Structure 1753.000m3
Expansion joint 288.000m
Contraction joint 127.000m
Dowel bar 450.000m
No Answer is Posted For this Question
Be the First to Post Answer
what is the difference between pumpable concrete and non pumpable concrete
how we can calculate the quantity of sand & cement & also Aggregate so give me to this answer for a slab Length is : 25' /3.28 = 7.62 Mtr Width is : 30' /3.28 = 9.14 Mtr Depth is : 0.6"/3.28 = 0.15 2Mtr
how many bags of cement required in neat cement finish per square metre
whats are the max value of providing of super-elevation in road way in various condition?
What is PQC. Means PQC
14 Answers Era Infra Engineering, L&T,
If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
what is bond strength of concrete
1:6 brick masonry cement and sand calculations
what is the load capacity of bored pile pile dia 500mm
While Calculating Quantity Of cement,sand,Metal we get cement in no of bags,Where Sand & Metal we get in Meter Cube(M3)how to convert it to Units(i.e in no of lorry's or Tractors )
Rust in Rod is harmful in structure because -––
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)