What is PQC. Means PQC
Answers were Sorted based on User's Feedback
Answer / arun d i
PQC is Pavement Quality Concrete, which is used for the
pavements for roads, runways etc. Here the mix design is
done with large size aggregate as per the IRC
specifications.
| Is This Answer Correct ? | 374 Yes | 30 No |
Answer / madhava reddy
pavement quality concrete used for run ways, toll
plazasand for long life of road construction.
| Is This Answer Correct ? | 119 Yes | 14 No |
Answer / venkateswara rao pothina
PQC, Pavement Quality Concrete meant for runways, toll plazas laid over DLC,dry lean concrete and a polymer sheet of 125microns thickness at temperature maintained below 30 degrees Celsius.
| Is This Answer Correct ? | 106 Yes | 7 No |
Answer / sagar kumar
This is Pavement Quality Concrete that's used for
Runway,Expreesway,Toll plaza, now & till N.H. for Long life
about 30 yrs.
it 's use where highly temprature variation and vehical
tyres take a brake in opposite case Bituminous Pavement in
that area may be Bleed or craked.
| Is This Answer Correct ? | 75 Yes | 7 No |
Answer / him a bindu
PQC means pavement Quality Control concrete.... Used for Runway, Dispersal area in order to withstand heavy loading....basically a rigid pavement design with flexural strength minimum 40kg/Sq.cm .....
| Is This Answer Correct ? | 20 Yes | 7 No |
Answer / haridass
pqc meaning pavement quality concrete ,it proved a 40mm aggregate use in this ype of concrete used in road way ,pavement rail way bridge construction used
| Is This Answer Correct ? | 9 Yes | 5 No |
Answer / mohammad yousuf pashtoon
P.Q.C is actually rigid pavement or plain cement concrete pavement which means there is no reinforcement in this type of pavement, but nominal reinforcement may use in it,
wearing surface of P.Q.C is plain cement concrete pavement,
materials for P.Q.C are:
cement
coarse aggregate
fine aggregate
| Is This Answer Correct ? | 6 Yes | 2 No |
Answer / basharat nazir wani
Pavement quality co create.40mm size of aggregate is used with concentrated admixture of cement and sand for its high strength due to daily dense traffic pressure on roads ,mostly used in toll plazas etc.
| Is This Answer Correct ? | 5 Yes | 4 No |
what will be the cost of constructing a plinth of (40x40x4)ft and a PCC layer of 4 inches?
How to increase a bearing capacity of soil?
Please any body describe me manpower used calculation for a building construction.
1 Answers Metro Constructions,
If i buy some material and the seller asks me my TIN number what does that mean?? Is it my Taxpayers Identification number or it is my Tax invoice number? What does both of these stands for???
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
Why we stop the concrete in 1/3 rd of span length
give the full form for upvc pipe & cpvc pipe
we have a texmo make submersible water pump 5hp 10 stage what will be the total head & is it any thumb rule for calculating the head please reply urgently
Why nautical mile is different from statute mile?
if we get water mor from 28 days to the rcc concret is this better or have a damag
how do we design mix ratio?
what is pure bending.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)