If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
Answers were Sorted based on User's Feedback
Answer / cherry
we have to calculate the date that the next day of cube catsting is.29th day
| Is This Answer Correct ? | 0 Yes | 2 No |
400 ku d/c clearess ketan hota hai?
why reinforcement is not provided at centre for beams r column
what post do you prefer to work in this company and why do you think you can serve better in such position?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
What is the effect of a building collapse?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
how many cement used in single story residential building per sqft
0 Answers Matrix PMC Consortium,
what is a pitot tube
yasser arfatcompleted his degree in civil from which university
how to find fineness modulus of sand?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
what are different grades of concrete and their classifications?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)