how we can calculate the quantity of sand & cement & also
Aggregate so give me to this answer for a slab
Length is : 25' /3.28 = 7.62 Mtr
Width is : 30' /3.28 = 9.14 Mtr
Depth is : 0.6"/3.28 = 0.15 2Mtr
Answers were Sorted based on User's Feedback
Answer / moiz
3.14 cft of concrete is required.
the quantity of cement sand and aggregates depends on the
proportion we make use of to make the concrete which is not
a big deal...
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / khadar babu
TOTAL VOLUME:
7.62*9.14*.15=10.44cum
(M15 concrete)
cement required= 10.44*6.48=67.7bags=3384.84Kgs
Sand required= 10.44*0.434=4.54cum
Aggregates required= 10.44*0.868=9.06cum
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / bala
Concrete quantity = 112.50 cft
Requried of cement = 19.11 nos bag
Requried of sand = 67.50 cft
Requried of metal = 101.25 cft
Is This Answer Correct ? | 0 Yes | 3 No |
List out some of the software program that can be useful for architect?
what is the difference between TOR & TMT
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
what are the ffactors you considered choosing the course?
What is the bending moment ?
1 Answers L&T, Manav Infra Projects,
1m square 20mm plastering how much of water need curing work
what is the difference between np2, np3 & np4 rcc pipes
Clarify the out turn of steel fixer in construction field
How to calculate the Quantity of Steel for Footing?
what is meant by Stagging?
if there is no alternative of silty sand avail near ,then how it is used in cement mortar or concreting?
what is the criteria for the finalisation of pavement thickness in road project?