how to estimate shuttering form work or how to take off material quantity???
Answers were Sorted based on User's Feedback
Answer / bharat raygor
shuttering area : perimeter length*height
| Is This Answer Correct ? | 1 Yes | 1 No |
to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / prem
work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity
| Is This Answer Correct ? | 1 Yes | 4 No |
how we can calculate a bentup hook in difreeent angles.for exp.at 90 degree,45degree,60 degree..
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
whta are the types of columns
What is allowable limit of silt in river sand for concrete
Please tell me the difference between nominal and clear cover. Thanks.
what do you know that m20,m25
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
What is the minimum depth of a slab?
What is c.g.i sheet which used for roof??
what is difference of NP3 and NP4 pipe and what is the thickness of 1000mm dia NP4 pipe
how meny typs of renging rod?
Clarify the out turn of steel fixer in construction field
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)