Answer / bharat raygor

shuttering area : perimeter length*height

Is This Answer Correct ?    1 Yes 1 No

how to estimate shuttering form work or how to take off material quantity???..

Answer / honnikery-007

to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .

Is This Answer Correct ?    0 Yes 2 No

how to estimate shuttering form work or how to take off material quantity???..

Answer / prem

work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity

Is This Answer Correct ?    1 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

Why we are using 150 mm X 150 mm X 150 mm cubes for testing the compressive strength of concrete in CTM and why not other sizes?

1 Answers   BARC,


State the type of roads and compare the advantages and disadvantages?

1 Answers   Parsvnath,


bulkege of concrete for design mix concrete for grade m30

2 Answers  


what is the slump of pile concreting work? give me the value of minimum and maximum value of slump and how give slump in pile?

3 Answers  


How to calculate the length of chairs provided to support the top rebar in concrete foundation

2 Answers   L&T, TCE,


How to calculate crank length? How to calculate hook length?

13 Answers  


What is GSB gradation

1 Answers  


What is a BBS?Find out the cutting length for a 600*600 foundation with 50 mm cover

1 Answers   CSL Group,


What should be the PH value of water for irrigation purpose

1 Answers  


what is cbr valuve

1 Answers  


If 16 mm dia hysd bar of grade Fe500 is needed in a beam but it is not available in the construction site but the beam has to cast in an emergency. Which dia of bar is to be used for for that situation? (If greater than 16 dia bar is not available at site)

2 Answers   Shreeji Associates,


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)