how to estimate shuttering form work or how to take off material quantity???

Answer Posted / honnikery-007

to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Material calculation of cm 1:6 for 1sqm

1488


how to preaper for interview wat they asked in interview give me idea

2159


please send me bhel questions on rupesh.017@rediffmail.com

2255


What is binding spacing of the rebars at lapping zones.

609


I am called for interview from north east power plant .so, I need some interview question which may help me.

1245






Is there any course for billing available in Mumbai? If yes then please mail me the details..

1804


What do you mean by honeycomb in concrete?

700


how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

1955


What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?

1769


why top layer of block work shoud be full size if any cut block adjustable than another layer?

1668


what is the max. area can we apply the plate load test ?

1917


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

1645


Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used

4268


1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40

2251


What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

2154