how to estimate shuttering form work or how to take off material quantity???
Answer Posted / honnikery-007
to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Material calculation of cm 1:6 for 1sqm
how to preaper for interview wat they asked in interview give me idea
please send me bhel questions on rupesh.017@rediffmail.com
What is binding spacing of the rebars at lapping zones.
I am called for interview from north east power plant .so, I need some interview question which may help me.
Is there any course for billing available in Mumbai? If yes then please mail me the details..
What do you mean by honeycomb in concrete?
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
what is the max. area can we apply the plate load test ?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?