how to estimate shuttering form work or how to take off material quantity???
Answer Posted / honnikery-007
to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What is rolling stock
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
What is the snap size in civil and how can we create it?
What is the density of DLC & PQC and how it is differ from normal concrete?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Does VDF add strength to the flooring apart from preventing water ingress?
What is change order request?
how can calculate cutting length of diamond ring
types of laps in column
What year was the keystone power plant in Indiana County constructed?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
how to stop beam concrete between column
What are the different softwares used for cad?
Define a polyline?