How to calculate the length of chairs provided to support the
top rebar in concrete foundation

Answers were Sorted based on User's Feedback



How to calculate the length of chairs provided to support the top rebar in concrete foundation..

Answer / gagan

If the slab thk. is 150mm,Bottom Bar dia - 12mm & top Bar dia - 10mm & Top Bottom Cover to Bar - 20 mm , Spacing between Bar is 200mm
width of chair +(Slab Thk.-Bottom bar dia.-Top Bar dia.-covet to bar)*2 + (300) *2


Then 800+(150-12-10-20-20)*2+(300*2)
=800+(88*2)+(300*2)
= 800-176+600
= 1576 mm

Is This Answer Correct ?    25 Yes 27 No

How to calculate the length of chairs provided to support the top rebar in concrete foundation..

Answer / sumit

Practicaly, it should be min.500mm or atleast 3 no. of
rebar should be rest upon the same whichever is higher to
be considerd.

Is This Answer Correct ?    5 Yes 14 No

Post New Answer

More Civil Engineering Interview Questions

Manpower required for de shuttering of conccrete slab

1 Answers   Ameco,


How much depth of excavation have to do for Highrised builldings?if Raft foundation how much,and Pile foundation how much?

1 Answers   GMR,


Why we stop the concrete in 1/3 rd of span length

1 Answers   L&T, NCC,


What is the difference between Grade I, II and III of GSB?

0 Answers  


estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?

0 Answers  






koi bta sakta ha ka steel ko calculate krna ka full mathod pls

4 Answers  


What is the bending moment ?

1 Answers   L&T, Manav Infra Projects,


In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment

8 Answers   Power Grid,


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

0 Answers  


From where the relationship of target strength comes in mix design(graph)

1 Answers  


how to identify different types of soils in field?

2 Answers  


compare the cost of construction of a building by cement and one in which cement is substituted by fly ash.

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)