Why we are using 150 mm X 150 mm X 150 mm cubes for testing
the compressive strength of concrete in CTM and why not
other sizes?
Answer / ratheesh
concrete Cube mould size is 150 X 150 X 150 and 100 X 100
X100mm.
Mostly site construction are using 150mm mould only, but
some RMC company's are using 100mm mould.
Cost deduction is the only reson.
| Is This Answer Correct ? | 5 Yes | 13 No |
Define What is the tallest man made structure in the world?
What is the basic difference between QA and QC
Why nautical mile is different from statute mile?
If a steel ring is 40 cm square and it's hooks are 8 dia of bar. The steel is 8mm. What is it cut length?
What is the use of water table & Kreb stone for drain
Explain moment of inertia and its importance.
how to calculate the amount of cement & sand required for plastering
What is standard sand? What is coarse & fine sand? What is foundation? What is the seze of hooks in various Reinforced section? What is the formula of providing clear cover? What is the basic diff. between working stress & Limit state design? What is &cbc and fck? what are the primary & secondary test of water purification?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Mention different types of roof systems?
Explain what is alternate bid?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)