how to estimate shuttering form work or how to take off material quantity???
Answer Posted / bharat raygor
shuttering area : perimeter length*height
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is the development length given in pile?
How will be cutting in timber plate size 600*400 column size
how many litres of enamel paint required for 5000 sft of site??
What is thumb rule in quality and quantity estimation of a Residential building??
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
How to calculate unit weight of concrete for m40 grade.
what are the ffactors you considered choosing the course?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
how can calculate cutting length of diamond ring
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
Prepare a Schedule for a Highrised building from starting stage to Handover?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?