what is PEB structure

Adarsh Group,

1 Civil Engineering 5981

what is ph value of water

Adarsh Group,

2 Civil Engineering 3026

what do you know lean concrete

Adarsh Group,

1 Civil Engineering 2639

how to find out compressive strength of concrete

Adarsh Group,

1 Civil Engineering 2982




Answers / { mallikarjun }

Question { NKB, 6734 }

what is the formula of concrete quantity


Answer

concrete quantity= length x breadth x depth of wall, column, footing

Is This Answer Correct ?    0 Yes 0 No

Question { 6046 }

how to estimate shuttering form work or how to take off material quantity???


Answer

to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .

Is This Answer Correct ?    0 Yes 2 No


Question { Ircon, 3398 }

how many numbers of Precast concrete hollow blocks (400mmx200mmx200mm) can be installed by the one mason and two helper in one day.


Answer

one mason and two helper can install atleast 125 numbers of block per day

Is This Answer Correct ?    0 Yes 0 No

Question { Cognizant, 3844 }

how to calculate number of bricks


Answer

1.
no.of bricks=length of wall x height of wall / length of brick x height of brick
for 100 thick wall and 150 thick wall only
2.
no. of bricks= volume of wall/ volume of brick

Is This Answer Correct ?    1 Yes 0 No

Question { PNC, 5822 }

minimum spacing of bars in column????as per code...???


Answer

minimum spacing of bars in column is75mm

Is This Answer Correct ?    2 Yes 0 No

Question { 3088 }

Deshuttering time for slab 6.15 meter


Answer

deshuttering time for long span 21 days

Is This Answer Correct ?    4 Yes 0 No

Question { Jain Housing, 2696 }

What is the Alternative material of cement, We use for Floor tilling and Wall tailing purpose?


Answer

tile adhesive