how to estimate shuttering form work or how to take off material quantity???
Answer Posted / prem
work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
Why are steel plates inserted inside bearings in elastomeric bearing?
what is the clear cover for shearwall?
What do you mean by the word 'shear'?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
What is construction mitigation management?
how we check the thickness and line of ceiling plaster.
in the construction of residential building what type of tank are used?where?why & what is its purpose?
What is proportion of PCC Grade G?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
How do you compute the volume of airflow?
Define graphics window?
What glue is least sticky?
what is parametre for M25 after 7 days strength
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?