how to estimate shuttering form work or how to take off material quantity???
Answer Posted / prem
work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity
Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
why the openings of sieves are square io size?
What is the difference between Grade I, II and III of GSB?
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
What is progress payment?
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
what is Short bored pile foundation.
What is meaning of FREE STANDING STAIRCASE ?
what is the meaning of 40/20 src
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
What is meant by a context menu in a cad software?
what is work of planning deptt. in any construction compny (in road project)
what is the maximum number of course that can be laid according to IS code and the max height.