how to estimate shuttering form work or how to take off material quantity???
Answer Posted / prem
work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
Explain the different types of building contracts?
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
will fix foundation bolts at site with out template is there any procedure?
important question on stones
it is possiblee to produce concrete with out cracks...
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
how to calculate steel for slab or footings?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
Any strength is a stress but any stress is not strength
what is the method used for marking of cantilevers in hirise buildings by using theodolite