what are all the challenges you faced in project implementation as a sap fico Consultant?
&
what are all the challenges you faced in ticketings?
Answer / kusuma
The first major issue you are likely to face is in deciding what the company will want SAP to do at first Go-Live and what they anticipate they will want it to do in the future. It is usually much easier to build things into SAP at the beginning, even if they will not be used immediately, than it is to change them later after postings are being made in a live system. To resolve this you need to make a full analysis of the current and predicted future needs of the organisation.
Your next issue is that SAP will probably work, and require users to work, in a different way to how things were done in the past. The way to resolve this is: 1) Minimise the differences where you can and where it will not detract from the advantages of changing to SAP. 2) Keep the users informed throughout the process. 3) Provide good quality SAP training before the system goes live. 4) Provide high quality support after Go-live until the users are competent with the new system.
During implementation you will almost certainly face the issue of how to bring data from the systems that an organisation is currently using into SAP. How difficult this is depends on how old the current systems are and how compatible they are with SAP. Sometimes you can import the data directly using tools built into SAP, sometimes you will need consultants to configure specific solutions and sometimes it is simply easier and more cost effective to spend the time transferring data manually.
There are many other technical and business issues you might face but those are common ones early in the implementation.
Is This Answer Correct ? | 5 Yes | 1 No |
What are substitutions and validations?
i want to check whether the particular cost center is assigned to which Controlling cycle.
i am getting error that"there is no item category assigned to account no(any account no)company while save the entries in gernal ledger, i able to simulate the entries but not to saved, i am using 6.0ecc version. so some one gave answer that"you activated document splitting for that u have to assign the item category for that g/l other wise u can deactive in docment splitting as per co code level".so pleaze any one tell me the path or method to how to deactive document splitting as per co code lever
How to make control on vendor master data (bank account ) . We can validate the changes with transactions FK08 & FK09 in functional menu , but I need the path on Spro guide to customize the changes (bank accounts )
what is chart of account and how many chart of accounts can be assigned to a company?
How many normal and special periods will be there in fiscal year, why do you use special periods?
What is awb? What is its purpose?
What are the components in financial statement version? : cost center accounting
hi all, can both partial and residual payments be posted in one invoice, if so what is the process for doing that?
i have created business place in 6.0 version but when i m taking the reports for TDS challans we have to give business place but its not showing business place can any one answer
What is Data archival and what objects should have archive from FI side in the project ?
Generally what order will be followed in implementation of sap modules?