Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How will you determine the capacity of a reservoir with help
of contur

Answers were Sorted based on User's Feedback



How will you determine the capacity of a reservoir with help of contur..

Answer / vydehi

the area of contour can be determined by dividing it into suitable parts(triangles,rectangles). then sum of the area of all definite parts will give total area.the conversion of scale is important.

Is This Answer Correct ?    4 Yes 0 No

How will you determine the capacity of a reservoir with help of contur..

Answer / vydehi

by calculating the area of that contour.

Is This Answer Correct ?    2 Yes 1 No

How will you determine the capacity of a reservoir with help of contur..

Answer / pranav panchal

You are right Vydehi, but can you describe me how can i
calculate the area of contour?

I think it can be calculated with the help of planimeter.

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

0 Answers   Jindal,


What"s mean by water macadam road (WBM)?

2 Answers  


what is the ideal construction joint for slab?

2 Answers  


Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??

0 Answers   NCC,


For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?

1 Answers  


what is the specific gravity of rubble in plum concert

0 Answers  


How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?

0 Answers  


advantages & disadvantages of using crusher dust instead of sand in r.c.c work

3 Answers   L&T, Shm Consultants,


If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not

2 Answers   Al Fara, Unity Infraprojects,


What are the advantages of cad software?

0 Answers  


form work including the props can be removed from beams only after

1 Answers  


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)