Answer Posted / yadav
1:0.75:1.5
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Pls explain me about tension and compression in a flat slab
what is the calculation of raw material for 0.35cum of m-15
what are the code used for residental building?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
What is the withdrawal force of steel nails?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
1:4:8 pcc calculation 591 cu.ft
What are the different methods for drawing an arc?
How is make concrete cube?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
What is gravity flow?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy