Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
Answer / rethina kumar
generally concrete is strong in compression, weak in tension, that is reason we providing reinforcement in tension zone.
1.column is compression zone, so one day is enough to deshutter
2.slab is tension zone, so it need minimum 14 days to deshutter
| Is This Answer Correct ? | 30 Yes | 0 No |
briefly describe your ideal job?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
What is the difference between absorption & adsorption and sorption?
what is super elevation?
what is the technical word for column and beam joint
How to find out slope footing concrete
0 Answers Ekta World, Punj Lloyd Ltd,
what do you know lean concrete
How many cement sand ballast in cc 1:4:8 40mm
mix design procedure, i.e m15 to m40
How much steel required in one cubic meter RCC Main girder
why we use aggregate,sand with cement in concrete?
Why we are using coarse sand for brick work and is there any technical problem if, we use fine sand instead of coarse sand.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)