Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
Answer / rethina kumar
generally concrete is strong in compression, weak in tension, that is reason we providing reinforcement in tension zone.
1.column is compression zone, so one day is enough to deshutter
2.slab is tension zone, so it need minimum 14 days to deshutter
Is This Answer Correct ? | 30 Yes | 0 No |
What is the difference between engineering stress and true stress?
difference between specification and method of statement
what is mean by bleeding of concrete
4 Answers Afcons, Habib Group,
at what height brick masonr, block masonry & Concrete wall can construct in a day ?
how calculate the bearing from two coordinates?
0 Answers DPTL, HPPCL Himachal Pradesh Power Corporation Limited,
What is the material consumption- cement,sand,tiles etc for Toilet dado?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
how much steel is required foe following components.. footing- plinth beam- column- beam- slab-
Define What is rigging?
Concrete cover for slab, column, beam and footing?
What is thickness of RC hume pipes of size, 300mm, 450mm,600mm
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.