in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage
Answers were Sorted based on User's Feedback
Answer / kailash sankhala
1% adjustment in w/c ratio, cement content
2% adjustment in aggregate content if desired slump is not obtained
| Is This Answer Correct ? | 11 Yes | 1 No |
Explain about Sulphate Resisting Cement ?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
how many types of foundation
how to calculate steel in slabs ?
what is tension footing?
0 Answers Wah Engineering College,
What is most important to learn in Civil Engineers? AutoCadd,Staad, or Primavera...
Where will be the maximum bending moment in a TEE Beam?
1:6 ratio block work purpose how much cement used
1 Answers Spago, VRC Constructions,
what is meant by csr in foundation? what is sbc?what is meant by contour line?
Father of "reinforced cement concrete"?
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
design mix for M15,M20, M25,M30 please
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)