Why are L-beams (cast monoloithic with slab)that usually
occur at the slab edge, provided with overhangs?
what is the difference between tsp & tower
how much quantity required on weight of cement & on weight of sand for 1:4 ratio mortar?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
What is the general specifications of a bituminous pavement road?
Special thing in designing a overhead reservoir ? which is different from an ordinary design
How to calculate paint drums per meter square
What is the difference between EPC,DBOOT and BOOT.
what the length we reduce for 45deg. bend for each side bend of bar.we know the 2d in case of 90 deg. bend.give clarification also?
12 mm dia not available at site for raft, 10 mm are available at site how to calculate?
What is the maximum allowable 'Silt content' in River sand
16 Answers IVRCL, Om Buildcon,
Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?
How to calculate brick work quantity?? Block work quantity??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)