in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage
Answer Posted / kailash sankhala
1% adjustment in w/c ratio, cement content
2% adjustment in aggregate content if desired slump is not obtained
Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
what is castigliano theaorem
VAT and CST ? Which benefits for buyer ? Why benefits?
how i get all type of short type question answer about civil engg
pls tell me about method of cutting length of ties column
1m square 20mm plastering how much of water need curing work
What is the difference between engineering stress and true stress?
how to tie 10 legged stirrups
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
Why Vitrified tile are getting pop up.
Why should you consider yourself fit to be hired by jindal steel.
how to remove the quantity of metal 1 and metal 2 in concrete
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
Explain how you can use different dimension tools in CAD? What are the different dimensions available?