in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage
Post New Answer View All Answers
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
How many kilo-newtons equals 1000 kilogram?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
I am called for interview from north east power plant .so, I need some interview question which may help me.
How to calculate brick work quantity?? Block work quantity??
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
Explain soil analysis?
is concealed wiring a problem in fly ash brick wall?
What is .Dwg?
How to take labor charges for construction of 1cum of concrete?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
What is OSHA compliance?