Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the lap length on column? state the farmula plz
with explaination.

Answers were Sorted based on User's Feedback



what is the lap length on column? state the farmula plz with explaination...

Answer / dhandeep desai

lap length for column 50d(formula & length )
or it is taken ld with dia. of bar

Is This Answer Correct ?    31 Yes 3 No

what is the lap length on column? state the farmula plz with explaination...

Answer / munirasu

LAP LENGTH FOR COLUMN 50D

Is This Answer Correct ?    4 Yes 2 No

what is the lap length on column? state the farmula plz with explaination...

Answer / sagar tiwari

formula= dx50=mm
example-for 16mm bar {d is the dia of bar}

=16x50=800mm {is the lap length of 16mm bar}

Is This Answer Correct ?    1 Yes 0 No

what is the lap length on column? state the farmula plz with explaination...

Answer / moin khab

Lap zone depend on arechitects &grade of concrete. 

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Define aligned dimension?

0 Answers  


Mix proportion of M30 grade?????????

4 Answers  


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

0 Answers  


what is unit weight of steel

11 Answers   RRB,


what is mean civil

5 Answers  


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

0 Answers  


I need old MMUP exam question and answer for Civil engineering

0 Answers   MMUP,


Which standard describes the tolerance limit for undulation of RCC wall/ after POP surface?

1 Answers  


15. List 3 of your weakest points as a worker?

2 Answers  


what"s the formula for circumference?

12 Answers   Ashok Leyland,


what u mean by M20

9 Answers   Srinidhi Constructions,


what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.

0 Answers   Gayatri,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)