Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is G.O.D.S. ?

Answers were Sorted based on User's Feedback



what is G.O.D.S. ?..

Answer / deepak thakur

Gang Operate Device

Is This Answer Correct ?    3 Yes 0 No

what is G.O.D.S. ?..

Answer / deepak thakur

GOD Means
Generate Operate Destroy

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

In India the supply voltage is 230 volt A.C. During the negative half cycle phase becomes neutral and neutral become phase? or what will happen during negative half cycle? how the electrons flow during positive and negative half cycle?

0 Answers   ITI,


11 kV line deraction check by an Engineer.

0 Answers  


design a LV scheme for a 15 storied building?

0 Answers  


What is called grain-oriented laminations?

0 Answers  


Pleasd Tell Me..... In Generating Stations Why The Generation Of ELECTRICITY Is In 3 Phase Form?? OR In Generating Station Why We Generates The ELECTRICITY In The 3 Phase?? Why Not In The 4 Phase, 5 Phase Or 6 Phase Form??

3 Answers  


What is the difference between RMS and average value

5 Answers   CEERI, HPCL,


draw tube light circuit

0 Answers   Badve, KPTL,


i have 60Hz motor, can i run it at 50Hz power supply ???

2 Answers  


can we install HT panel & LT panel side by side or how much clearance is required ?

0 Answers  


quantizer means?

0 Answers  


From what on-site components does the HT panel monitoring the bus-bars in a 11kV system take inputs?

0 Answers  


In an ideal transformer no load primary current I0 A lags behind V1 by 90 degree B is in the phase with V1 C leads V1 by 90 degree D lags V1 by 45 degree

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)