We are installing a 1.6 MVA transformer at our crusher plant and the feeder of HPSEBL is 2 km away at substaion .
and a VCB is installed in the substaion which is 2 km away from transformer so we need another VCB near the transformer.

Answers were Sorted based on User's Feedback



We are installing a 1.6 MVA transformer at our crusher plant and the feeder of HPSEBL is 2 km away a..

Answer / k.prakashchandra

VCB in the MUSS is for line protection and you need another for transformer protection

Is This Answer Correct ?    3 Yes 0 No

We are installing a 1.6 MVA transformer at our crusher plant and the feeder of HPSEBL is 2 km away a..

Answer / sarthak

VCB must be installed as you are using quite a good capacity transformer.
Which needs better protection and the VCB at the sub station will not be that helpful ,
if ever you need to do maintainence job on your t/f you task will become easy.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

no EB power DG is not starting?

6 Answers  


what should be the acceptrd value of winding resistance for 2.5MVA transformer

1 Answers  


what is %impedanece

3 Answers   KSEB, Steel Plant,


how and where megger works?

9 Answers   Power Grid,


is that a problem if i connect a single phase load to a secondry delta connected transformer but i get a neutral from other transformer i the system?

1 Answers  


A ii kv 1200 A Breaker combination fixed in a cubicle. How many ampere Fuse is required? If fuse is not using, Why?

1 Answers  


distribution is maximum done by a)radial b)network c) parallel d)b & c

1 Answers  


what is meant by 2 within a star in a voltmeter dial?

1 Answers  


before transformer oil dielectric strenght tests are taken the oil should be allowed to settle to remove option 1 air bubbles 2 gasses 3 contamination 4 water

1 Answers  


Why do we generate 3 Phase AC Supply? It is possible to generate 4 Phase and 5 Phase explain it?

4 Answers  


what is difference between co-generation and captive power plant?

3 Answers   TATA,


What are the difference between CT/PT operated Meter and RRAMR Meter for HT/LT application?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)