before transformer oil dielectric strenght tests are taken the oil should be allowed to settle to remove option 1 air bubbles 2 gasses 3 contamination 4 water
No Answer is Posted For this Question
Be the First to Post Answer
What is SF6 Circuit Breaker?
what are the standard IR values should be of R-E, Y-E, B-E, R-Y, Y-B, B-R of VCB in closed condition and in open condition for 500KVA & 1000KVA transformers. and what is the acceptable range when tested by 5000V megger.
Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir
What is the power requirement of tamil nadu for one month?
what is meant by form factor and hoe related with the HT transmission voltage
Why the power factor improvement is so important in industrial loads
If the earth is a good conductor of electricity, why don't people get shocked every time they walking on earth?
At what distance power transformer can be placed from generating ?
Why frequency changes due to load variation in power system ? i.e why when load increases frequency decreases?
Why the stator is rotated in ceiling fans not Rator?
we use Dyn11 trafo for distribution purpose, if it`s possible for replacing Dyn1. if it`s change means what will happen?
WHAT IS TANK CKT.?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)