Answer Posted / shadavali123@gmail.com
H/3(A1+A2+underwrote 4AM) where is the h is the height of tepar of footing A1 is the area of column size area and A2 is the fotting is the base area AM is the mid point .so end
| Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
Civil engineering related
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
What is the use of offset command?
Define What materials were used to build the Golden Gate Bridge?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
Different sizes of Hollow blocks and its weight. Thanks.
What is the quantity of cement in mix m20 concrete?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
what is the difference between replacement of cement by groundnut shell ash
how many types of survey and what are levelling instrument?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
What are the common ways of demolition?
How do you prepare Material Recovery Statement for deduction from contractors bills?