How to estimate quantity of paint in 1M3
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
0 Answers Public Service Commission,
Wat are the elements consider in the shuttering load design calculation
What is the difference between M20 and M25 concrete?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
what is the main difference b/w compaction and consolidation
how much L is provide in footings. what is min and max length of L. what is the formula
whch is the grade of OPC
How cracks in concrete can be avoided?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
why the horizontal crack occoured in the joint between brick work and lintel?pls. give clarification???
How many layers in 12mm and 18mm plywood?