Answer Posted / k singh
H/3 (A1+A2+under root A1xA2)
H/6 (A1+A2+4Am)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
How to activate isometric axes in cad?
Explain what is Hybrid Foundation?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
What is the difference between EPC,DBOOT and BOOT.
What are your future hopes for this job?
what is c4x light weight cement blocks
In jack arch floor, the rise is kept?
Please design 12.5m long dubbly beam
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
How to calculate carrying capacity of the existing water supply trunkmain
Describe the sections included in a typical bill of quantities
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
What are the different types of runners?