Answer / koshik
Brick work :-7to10 days
All concreting:-14to20days
| Is This Answer Correct ? | 11 Yes | 0 No |
Answer / dileep naik
It is depending upon weather condition.
Generally Brick & concrete work cured atleast 7days.
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / abdul aziz
Concrete 7 day 21 days depend on weather or no need curing use thermal blanket for self curing or curing compound chemicals
| Is This Answer Correct ? | 0 Yes | 0 No |
how to calculate the amount of cement & sand required for plastering
WHAT DLC DESIGN IN CONSTRUCTION
how to calculate the volume of water in the water tank (5'x5'x5')? what"s the formula?
15 Answers Fire Safety, MAHINDRA, New Star Construction, Shankar Electricals,
compressive strength of country bricks in india
What is the meaning of soil reinforcement?
what we execute firstly wall tile or floor tile?
7 Answers Colliers International,
Explain what is zoning permit?
Define What is an ice dam sock?
how can we differentiate the KOTA STONE and SHAHABAD STONE by vision?
Define What is the force exerted by the Tacoma narrows bridge?
how to caliculate required amount of cement and sand required for 1cu.m.
What is ideal location for cube casting, RMC vehical at Ground Floor and Slab casting at 40th Floor
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)