Brick work how many days curing and at any concreting pl
Answers were Sorted based on User's Feedback
Answer / koshik
Brick work :-7to10 days
All concreting:-14to20days
| Is This Answer Correct ? | 11 Yes | 0 No |
Answer / dileep naik
It is depending upon weather condition.
Generally Brick & concrete work cured atleast 7days.
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / abdul aziz
Concrete 7 day 21 days depend on weather or no need curing use thermal blanket for self curing or curing compound chemicals
| Is This Answer Correct ? | 0 Yes | 0 No |
What are the strongest shapes in building?
Draw the cross section of a boundary wall and label its part with detailing?
What is PQC. Means PQC
14 Answers Era Infra Engineering, L&T,
Differentiate orthographic and isometric projections?
how meny typs of renging rod?
What are the skills required to become an architect?
why is M30 grade Concrete use for Foothing & Column M50
How many steel is require in one cubic meter area?
for a tachometer the additive & multiplying constant are 0 & 100 100 & 0 0 & 0 100 & 100
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
1 Answers L&T, R R Thulasi Builders,
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)