Draw the cross section of a boundary wall and label its part
with detailing?
No Answer is Posted For this Question
Be the First to Post Answer
how much extra rod length should be provided for beam
if 20mm & 10mm coarse aggregate we have consider same prapotion than how to analysis m25 concrete
why cylinder for split tensile strength test ?
Can anyone give me the thumb rule for calculating the time required for construction based on quantity of concrete, Reinforcement, shuttering, etc
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
what is the diferance np3 and np4 pipe
1 Answers Sharda Construction,
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
What is the minimum compressive strength of a brick according to IS codes ?
30 Answers Arup, CCCL, GMR, L&T, Rachana Sansad, Theme Engineering, WAPDA Water and Power Development Authority,
whch is the grade of OPC
significance of specific surface area of particles?
Write short note on construction programme for pile foundation.
What is bylayer?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)