How reactor of SBR installed , is it be over ground, fully
under ground or semi sunk ?
No Answer is Posted For this Question
Be the First to Post Answer
How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300 sft in final coat with 12 mm. Any math involved? Plz help
31 Answers Asia Engineering, GMS, LTT,
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
how much to get of BRC lapping in full yield and half yield ?
what"s the different between OPC (ordinary portland cement) and PPC (pozalana portland cement)?
3 Answers Ashok Leyland, Marathon Realty,
What is the difference between load bearing and non load bearing walls? How to distinguish both?
What is Base Shear ?
purpose of hook and bend in reinforcement ?
What things architect have to take care of before starting any project?
Material calculation of cm 1:6 for 1sqm
what is the difference between highway and motorway?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
How many bricks are there in 100cft?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)