Brick work how many days curing and at any concreting pl
Answer Posted / dileep naik
It is depending upon weather condition.
Generally Brick & concrete work cured atleast 7days.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
why demand factor less then 1 ?
what is the relation between pitch of steel and depth of slab?
in design case of structural member best suitrable percentage of steel limit is what
how to absorb to site basic corrections? which are the important correction?
Form where IS456 is adopted in 1978?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
how is the reinforcement is distributed in triangular slab
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
How do you convert wind speed into force?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
Gidc technical que paper
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
How can i do RCC rate analysis?
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.