Brick work how many days curing and at any concreting pl
Answer Posted / dileep naik
It is depending upon weather condition.
Generally Brick & concrete work cured atleast 7days.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Bernaullis theorem deals with the law of conservation of mass momentum energy none
Why reinforcement done in shorter span in two way slabs
Define What is rigging?
What is the difference between Grade I, II and III of GSB?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
Questions related to civil.engg in company
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
What is absolute pressure? How absolute pressure is calculated?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
What is Time period of a building and its relation with frequency ?
what is grade intersection?
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.