Differentiate orthographic and isometric projections?
No Answer is Posted For this Question
Be the First to Post Answer
How much is the cover for slab?
how to calculate valuation for the old building?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
what is the difference between stress and pressure??
what is bulkage
How to distinguish that the soil is clay, silt, sand & murrum at site. (just by looking at it with out doing the sieve analysis test??
What are the defects in concrete?
how much M-25 steel reinforcement per cubic meter in commercial building as per IS code
what is the stirrups? and which condition it is used?
can u plz send me ntpc placement papers(civil engineering) at munjalricha1988@gmail.com and which types of questions are aked by ntpc
What are new technologies in civil engr. that can reduce construction cost?
What is the correct position of lapping splice of reinforcement steel bars in a beam at top & bottom of the beam?? what is the reason for this location?..what are the factors affecting lapping location in beam?