if we get water mor from 28 days to the rcc concret is this better or have a damag
Answers were Sorted based on User's Feedback
Answer / santosh
as we know after 28 days concrete attains 90% of its strength
and concrete takes years to attain 100% of its strength so there is no point curing more.it is wastage of water
Is This Answer Correct ? | 15 Yes | 0 No |
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
specific gravity of sand, coarse aggregate, cement.
which tests for concrete pouring period at the site?
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
what is the difference between sill beam,Tie beam and plinth beam?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
what are the functions of wall
Why is loose concrete removed from the surface where new concrete is to be done?
What is absolute pressure? How absolute pressure is calculated?
the internal dimensions of a ware house are 15m *5.6m and the maximum height of piles is 2.70m find the maximum numbers of bags to be storedin two piles
In reclamation works what are the importance of geotextiles and sand?
numerical example of solving water cement ratio